ESCO / ASSET FINANCING

Energy Efficiency Without Upfront Investment using Heat Pump.

We invest 100% of the capital. You pay nothing upfront. Savings begin from Month 1, and ownership transfers fully to you at the end of the contract term.

₹0 upfront investment
Savings from Month 1
Performance-linked recovery
Full ownership at contract end
Financial Framework

Outcome-Linked Savings Flow

Dhivegaa Capex
100%
Client Upfront Cost
₹0 Capex
Post-Contract Ownership
100% Client Owns

Savings Guaranteed

Tied directly to verified energy savings offsets.

Outcome-Linked Models

A Financing Model Built Around Your Savings

Dhivegaa finances, implements, monitors, and maintains energy-efficiency projects through outcome-linked commercial models. The structure, savings split, duration, carbon participation, and ownership transfer are agreed upfront.

Model #1Shared Savings

Shared Savings Agreement

The savings split, contract duration, maintenance responsibilities, carbon participation, and ownership transfer date are agreed upfront in writing.

Key Details
  • Base-case savings split: 70% Dhivegaa and 30% client split
  • Contract duration: Pre-Agreed Period
  • Carbon revenue participation: Pre-Agreed split
  • Ownership transfers fully to client at zero cost at the end of the term
Model #2PMC / Advisory

PMC / Advisory Model

Dhivegaa manages equipment procurement, civil works, electrical integration, commissioning, and staff training.

Services Included
  • Equipment sourcing through an approved OEM network
  • Civil works coordination and site preparation
  • Electrical integration, installation, and commissioning
  • Comprehensive staff training & handover protocol

Solutions That Can Be Financed Under the ESCO Model

Dhivegaa finances and implements thermal and electrical efficiency interventions across industrial, commercial, and institutional facilities.

Solution #1

Heat Pump Systems

High-efficiency heat pump systems with a High COP, designed to replace or reduce dependence on fossil fuel boilers.

Suitable For: Industries, hotels & hospitals
COP Value: High COP
Config: Air/Water & Water/Water
Capacity: 25 kW to 500 kW
Temp Range: Up to 120°C
Monitoring: IoT based realtime
Solution #2

Building and HVAC Efficiency

Heat-pump-based HVAC systems capable of delivering heating and cooling through an integrated energy-efficient system.

Suitable For: Built-environment projects
Facilities: Hotels, hospitals, campuses
Features: Simultaneous heating & cooling
Assessments: Building-envelope diagnostics
Solution #3

Energy Audit and Baseline

A detailed facility assessment that establishes the verified energy-consumption baseline required for savings and projects.

Suitable For: All sectors
Audit Scope: Thermal load & fuel-cost profiling
Auditing Cost: reasonable
Coming SoonSolution #4

Waste Heat Recovery

Capture and reuse heat from flue gases, exhaust systems, steam condensate, and cooling systems.

Suitable For: Industrial clusters
Relevant Sectors: Glass, Ceramics, Metals, Food
Tech: Economisers & Condensate loops
Coming SoonSolution #5

Boiler Efficiency Upgrades

Efficiency improvements for boilers where full replacement is not yet technically or financially optimal.

Suitable For: All sectors
Efficiency Gain: 15% to 30% Improvement
Scope: Burner upgrades & Air-fuel tuning
Insulation: Pipe & Vessel insulation
Coming SoonSolution #6

Motor & Drive Efficiency

Reduce electrical energy consumption through high-efficiency motors, variable frequency drives, and compressed-air optimization.

Suitable For: Manufacturing facilities
Tech: VFDs on pumps/fans, IE4 motors
Optimization: Compressed-air leak reduction
Power Factor: Correction panels integration
Step-by-Step Transition

The ESCO Process

We invest. You save. You own.

Our transparent, four-step ESCO transition removes capital constraints and transfers operational savings directly to your bottom line.

01
Initiation

Rs.0 Energy Audit

Dhivegaa performs a complete baseline energy audit mapping your thermal workflows with zero plant operational disruptions at Rs.0 investment.

Commercial CommitmentRs.0 cost and zero obligation
02
Agreement

Pre-Agreed Terms

We agree on the savings split, contract duration, maintenance responsibilities, and ownership transfer based on energy audit findings.

Savings SplitPre-agreed split and sharing period
03
Deployment

Immediate Shared Savings

We deploy high-efficiency heat pumps (COP 3.5+). Operating savings are realized and shared immediately from Month 1.

Efficiency ValueCOP 3.5+ Heat pump efficiency
04
Ownership

100% Asset Transfer

At the end of the pre-agreed contract sharing period, 100% ownership of the assets and all future utility savings transfer fully to you.

Final Outcome100% ownership transfers to entity
Simulate Projections

Estimate Your Savings in 60 Seconds

Input your current boiler operational parameters and fuel expenditures to preview your indicative financial offsets and Dhivegaa Shared savings projections.

Parameters

Operational Inputs

kW
Client Savings Share (%)30%
10% (Min)50% (Standard)90% (Max)
* Standard parameters are based on baseline averages. The final shared-savings term sheet is calculated using custom engineering logs collected during a physical audit.
Indicative Projections Ready
Indicative Fuel Cost Cut

30% - 40%

Immediate monthly savings share.

CO₂ avoided (10 yrs)

-- t

Scope 1 boiler replacement offset.

Unlock Full Savings Projections & 8-Year Chart

The Next Step
Costs You Nothing

Request a free baseline energy audit. Our team will visit your facility, assess your energy systems, and present verified savings projections before you make any commitment.

Audit Process & Scope

What our engineers analyze on-site:

We perform a completely non-invasive utility baseline audit mapping your thermal workflows with zero plant operational disruptions.

1. Thermal Load Profiling

We measure steam, hot water, and drying loads to size exact Heat Pump requirements.

2. Utility Loop Integration

We review connection points inside your utility lines to ensure clean plumbing design.

3. Carbon Sizing (CCTS)

We calculate baseline fuel displacement to project potential carbon credit asset value.

Zero Capital Risk Guarantee

Dhivegaa funds 100% of equipment, installation, and on-site audit costs. If we don’t save you money, you pay nothing.

1
Profile
2
Diagnostics

1. Contact & Company Details